Eco Gen USA pairs energy storage with generator power to help demanding operations run cleaner, control fuel costs, and keep moving.

What is hybrid energy storage?

The hybrid system acts as an energy buffer between generator power and jobsite loads. It stores energy and deploys it as the load requires, helping the generator respond to changing demand.

One construction site. 30 days of operation.

In one reported 30-day construction deployment, the site recorded 83.6 total generator runtime hours, 636+ generator hours eliminated, $8,600+ in diesel fuel savings, and $6,000+ in net savings after service costs. These are specific-site results, not typical or guaranteed outcomes.

Quieter job sites

Hybrid energy storage can reduce gas-powered generator noise by nearly 75% each day, helping create a quieter job site. Actual noise reduction depends on equipment, system configuration, load, and site conditions.

Explore hybrid energy storage by application

Straight answers

Hybrid energy storage, clearly explained.

What is hybrid energy storage?

It combines energy storage with generator power. The storage system acts as a buffer between the generator and site loads, storing and deploying energy as demand changes.

Can hybrid energy storage reduce diesel use?

Depending on site conditions, load profile, and operating schedule, it can help reduce generator runtime and diesel use. Actual results vary, and no specific outcome is guaranteed.

Where can hybrid energy storage be considered?

It can be considered for construction, crane operations, telecommunications, disaster relief, events, remote industry, and oil and gas sites. Whether it fits depends on site loads, generator setup, schedule, and conditions.

What results did one construction site report?

One specific 30-day construction deployment reported 83.6 total generator runtime hours, 636+ generator hours eliminated, $8,600+ in diesel fuel savings, and $6,000+ in net savings after service costs. These results are not typical or guaranteed.

How can I tell whether a system could fit my site?